English (EN)

Geraldton Engineering – Geraldton WA

Background information

The end user was a contract materials handling firm, unloading various materials from ships and delivering them to local customers. The ship unloading process involved a clam shell grab, each time the product was dropped into the hopper dust was released.
Local authorities had informed the end user that this dust had to be managed before they would be allowed to unload anouther ship. The next ship was due in six weeks.

Solution

Geraldton Engineering supplied and installed a system inclusive of Mideco’s Burnley® Baffles and a Mideco model 15A dust collector. The whole project was delivered within the six week window.